CAIRN – INDIA
- CLIENT : CAIRN INDIA LTD
- PROJECT SITE : DEVELOPMENT OF UPSTEAM OIL & GAS FIELDS – BARMER , RAJASTHAN, INDIA
- PLANT : MANGALA , BHAGYAM , AISHWARYA FIELDS
- TERRAIN : DESERT
- SCOPE : FABRICATION , ERECTION , INSTALLATION & COMMISSIONING OF SKIDS , PIPING & STRUCTURALS AT VARIOUS WELL PADS LOCATED IN THE OIL & GAS FIELDS
- EXECUTION TEAM : 100 + WORK FORCE & SITE ENGINEERS

CAIRN – INDIA
- PLANT : MPT, BARMER, RAJASTHAN
- CLIENT : CAIRN INDIA
- CONTRACT : PIPING FABRICATION / ERECTION AT VARIOUS WELLPADS & FABRICATION YARD IN THE PROCESSING TERMINAL
- HIGH PRESSURE PIPING WORKS UPTO 200 BAR PRESSURE
- WORK FRONT TOTAL CONTRACT : 50,000 INCH DIA
- SIZE : UPTO 30” PIPE SIZE
- MATERIAL
- DUPLEX STAINLESS STEEL
- STAINLESS STEEL
- CARBON STEEL
- DURATION : 5 MONTHS
- TERRAIN : DESERT
- SERVICE : HYDROCARBON
- OTHER SERVICES : IBR PIPING, SHUTDOWN ACTIVITIES
- TPI : SGS, IRS

CAIRN – COMMISSION CONTRACT
PROJECT : A
- PLANT : MPT, BARMER, RAJASTHAN
- CLIENT : CAIRN INDIA
- CONTRACT : PRE COMMISSIONING / COMMISSIONING WORKS AT VARIOUS LOCATIONS OF PETROCHEMICAL COMPLEX
- SCOPE : PRE COMMISSIONING & COMMISSIONING ACTIVITIES LIKE LINE FLUSHING,AIR BLOWING, STEAM BLOWING, PRESSURE LEAK TEST, ETC
PROJECT : B
- PLANT : BARMER,RAJASTHAN – CPF PROJECT TRAIN 1 TO TRAIN 5
- CLIENT : IETS, CHINA
- CONTRACT : PRE COMMISSIONING / COMMISSIONING WORKS AT VARIOUS LOCATIONS OF PETROCHEMICAL COMPLEX
- SCOPE : PRE COMMISSIONING & COMMISSIONING ACTIVITIES LIKE LINE FLUSHING, AIR BLOWING, STEAM BLOWING, PRESSURE LEAK TEST, ETC.
WELL PAD SKID PACKAGE


CAIRN – INDIA
- PLANT : MPT, BARMER, RAJASTHAN
- CLIENT : CAIRN INDIA
- CONTRACT :
- SCOPE 1:WELL PAD CELLER PIT SKID PACKAGE FABRICATION , ASSEMBLY, ALLIED MECHANICAL WORKS & ERECTION
- SCOPE 2 : INSTRUMENTATION, ELECTRICAL ,PRE COMMISSIONING, INSTALLATION COMMISSIONING AND COMPLETE FAT AT SITE
- WORK FRONT : SKIDS / EQUIPMENT / PIPELINES CONTRACT
- DURATION : 4 MONTHS
- TERRAIN : DESERT
- SERVICE : HYDROCARBON
- TPI : SGS, IRS

EQUIPMENT – INSTRUMENTATION ACTIVITIES
- INSTALLATION OF FIELD INSTRUMENTS AND F&G DETECTORS
- FABRICATION / INSTALLATION OF INSTRUMENTS SUPPORTS / JB SUPPORTS / AIR HEATERS SUPPORTS
- FABRIATION AND INSTALLATION OF CABLE TRAYS INCLUDING COVERS
- CABLE LAYING FROM JUNCTION BOX TO INTRUMENTS
- GLANDING AND TERMINATION OF INSTRUMENTATION CABLES AT JB AND FIELD INSTRUMENT
- PREPARATION OF RFI TO CIL QC FOR INSTRUMENT INSTALLATION ACTIVITIES AND CORRESPONDING MAINTENANCE MANUAL AND DOCUMENTATION
- IMPULSE TESTING OF AIRLINE TUBING
- XSV / CV/O OFF VALVES STROKE CHECKS BEFORE AND AFTER INSTALLATION (USING TEMP. FACILITIES LINE NITROGEN CYLINDERS / DRY AIR)
- INSTRUMENT CALIBERATION INCLUING FIELD CALIBERATION REPORTS FOR ALL INSTRUMENTS
- COLD LOOP CHECKS UPTO JB
- SIMULATION OF INSTRUMENTS/VALVES
- ILD PREPARATION/VERIFICATION AND SUBMISSION
- PUNCH LIST LIQUIDATION
EQUIPMENT – ELECTRICAL ACTIVITIES
- FABRICATION AND INSTALLATION OF CABLE TRAYS AND COVERS AND JBs LIGHTING FIXTURES SUPPORTS
- EARTHING & GROUNDING / TRAY BONDING
- LIGHTING AND EHT CABLING
- CONTINUITY CHECKS OF LIGHTING CABLES , POWERING UP OF LIGHTING SYSTEMS USING TEMP. SOURCES (DG SETS)
- CONTINUITY CHECKS OF EHT POWER CABLES / RTD CABLE AND TEMP. POWER UP’s
- AS BUILT PREPARATION AND PUNCH LIQUIDATION
SITE : INSTALLATION / COMMISSION




CAIRN INDIA
- PLANT : MPT, BARMER, RAJASTHAN
- CLIENT : CAIRN INDIA
- CONTRACT : SHUT DOWN PROJECT
- DURATION : 2 MONTHS
- TERRAIN : DESERT
- SERVICE : HYDROCARBON
- TPI : SGS, IRS

TECHNICAL MANPOWER SUPPLY
- SSIS is catering Cairn India’s Oil & Gas Field requirements by supplying highly competent technical Manpower Supply
- For Various Domains as follows
- Structural
- Piping
- Electrical
- Civil
- Instrumentation
- Covering all the categories that is From Senior Level Managers to Field Construction team
Onsite Structural Fab.
- SSIS is currently executing Structural Field Fabrication Project at Cairn India Rajasthan Facility
- Total Scope Covering : 800 tons Fabrication
- Workforce Of 120 nos deployed
- Stringent safety noms as per Cairn Oil /Gas Field Noms
- From heavy Structures to Light Scale Fabrication activities
- Contract Period : March 2016 to March 2017
HSE AT SITE – CAIRN


SSIS – CAIRN SAFETY AWARD


RELIANCE INDUSTRIES LTD.
- PLANT : HNUU/PLATFORMER PROJECT, JAMNAGAR
- CLIENT : RELIANCE INDUSTRIES LTD
- CONTRACT : SHUT DOWN PROJECT
- DURATION : 1 MONTH
- TERRAIN : INDUSTRIAL
- SERVICE : HYDROCARBON

PIPELINE PROJECT : A
- ISBL-UG PIPE CS-NIBR>=2″
- ISBL-UG PIPE >6″ TO <=24″
- SCOPE OF WORK
- LAYING
- WELDING
- TESTING
- CLOSURE
- SITE : RELIANCE, JAMNAGAR (J2)

PIPELINE PROJECT : B
- CS-NIBR, TIE-INS – UP TO 8″ DIA: 15 EA
- ISBL-UG PIPE LAYING <= 6“
- ISBL-UG PIPE LYNG >6″ TO <=24“
- ISBL UG-FLNGD VLV EREC<=6″,<=300#
- FIELD- MAKING OF INSERT PLATE
- FLD RADIOGRAPHY-PIPE>4″DIA,<=20MM THK
- REPAIR OF W & C BY COLD TAPE
- SCOPE OF WORK
- LAYING
- WELDING
- TESTING
- CLOSURE
- SITE : RELIANCE , JAMNAGAR (J2)

REVAMP PROJECT : SEZ COKER, J2, RIL
- YARD PIPING
- CS IBR WELDING, TESTING, HYDRO
- 4500 INCH DIA
- PIPE SUPPORT WORKS
- ABOVE GROUND PIPING
- CS IBR WELDING, TESTING, HYDRO
- 3300 INCH DIA
- PIPE RACK (INCL. LOOPS / BRIDGES)
- ERECTION OF PIPING – IBR
- 7500 INCH METER
- VALVE ERECTION
- STEAM TRACER
- WELDING & ERECTION
- 9000 RMT

COMPLETE REVAMP PACKAGE
REVAMP PROJECT : DTA, J2, RIL
- STRUCTURAL FABRICATION
- ERECTION – STRUCTURALS
- IBR /NIBRWELDING
- IBR/NIBR PIPING ERECTION
- INSULATION
- BLASTING
- PAINTING
- INSULATION

GREEN FIELD
- FIRE WATER PIPE LINE
- EXCAVATION
- LAYING
- FABRICATION
- INSTALLATION
- TESTING
- PIPE RACK & ASSOCIATED PIPING WORKS
- FABRICATION
- ERECTION
- SCAFFOLDING
- VALVE ERECTIONS
- EQUIPMENT ERECTION
- HANDRAILS, PLATFORMS & STRUCTURALS

- PROJECT : PARAXYLENE T-4 , J3 PROGRAM RELIANCE
- EQUIPMENT: VEPOUR RECOVERY UNIT MODULAR PLANT
- QTY : 1 NOS.
- CONSULTANT: FOSTER WHEELER ENERGY LTD
- SCOPE :
- DETAILED ENGINEERING, PROCUREMENT,FABRICATION, ERECTON, TESTING/FAT, INSTALLATION INCLUDING ELECTRICAL &INSTRUMENTATION, VAVLES, PUMPS
- SKID SIZE : 16 meters x 15 meters
- PIPING : 5500 INCH DIA
- ERECTION WEIGHT : 120 TONS PACKAGE
- VESSELS ON SKID : 6 nos.
- Absorber tower (12 m)
- Carbon Beds
- 2 Phase Separator
- Hold Vessel
- VALES / INSTRUMENTS / PUMPS : MORE THAN 150 NOS.

MODULAR SKID PLANT – ACTUAL

3D : VRU MODULAR PLANT

VRU – MODULAR PLANT SKID

JSW STEEL LTD (JINDAL)
LSTK CONTRACT – TORANAGULLU
- H2S DESULPHURISATION PACKAGE
- TECHNOLOGY PARTNER : AIR SCIENCE,USA
- END USER : JINDAL (JSW) LTD, BELLARY
- SCOPE : DETAIL ENGINEERING, PROCUREMENT, FABRICATION, SUPPLY, ERECTION, INSTALLATION, COMISSIONING
————————————————————–
- Tankage Fabrication along with associated works
- Tank Erection – 12MT- Stainless steel
- Platform and Stair Structure – 3 MT
- Piping Fabrication – 300 ID
- Piping Erection – 570 IM
- Media Filling – 45MT

JSW STEEL LTD. (JINDAL)


UEM / TECHNIP / JBF
- END USER : JBF PETROCHEMICAL
- PLANT : SURATKAL, MANGALORE
- CONTRACTOR : TECHNIP
- CLIENT : UEM, NOIDA
- CONTRACT : SPOOL FABRICATION AT SHOP
- MATERIAL: STAINLESS STEEL / CARBON STEEL
- VARIOUS SPOOLS : 61 NOS.
- TPI : BUREAU VERITAS

TANKAGE : TECHNIP/UEM
- END USER : JBF PETROCHEMICAL
- PLANT : SURATKAL, MANGALORE
- CONTRACTOR : TECHNIP
- CLIENT : UEM, NOIDA
- CONTRACT : STAINLESS STEEL TANKAGE 4.5 METER DIA
- MATERIAL: STAINLESS STEEL / CARBON STEEL
- TPI : BUREAU VERITAS

TANKAGE PROJECT
- ARP PROJECT, ANDRITZ
- PROCUREMENT, FABRICATION, ERECTION
- CLIENT: ANDTRIZ
- EQUIPEMENT: ROASTER
- WEIGHT : 100 TONS
- DIA : 8.5 METER
- HEIGHT : 6.5 METER
- MATERIAL : IS 2062